USS Calvert – Chronological Research Notes – 1941.11.15 to 1942.12.31

The document below contains detailed chronological research notes for the period November 15, 1941 to December 31, 1942. During this period the USS Calvert:

  • Was built, launched, trialed and placed into commission.
  • Converted to transport by the U.S. Navy and underwent her shakedown cruise.
  • Exchanged boat crews and officers with the USS Harry Lee and readied for emergency departure to participate in the Invasion of North Africa.
  • Sailed to Safi, French Morocco and participated in the landings and unloading at Safi, French Morocco as part of Operation Torch.
    • The details for November 8th are relatively complicated given a series of contingent plans for landing plan at Safi and the Calvert’s specific role in the invasion.
    • The story line is not as clear as I would have liked them to be in a published document, however I have decided to publish this section as-is.
  • Returned to Norfolk, VA and underwent repair, upkeep, and yard work.

View and download the 49 page document here: USS Calvert – Chronological Research Notes – 1941.11.15 to 1942.12.31

Additional documents covering other periods of WWII are available here: https://www.usscalvert.com/history/apa32-1942-1947/

Notes:

  • The document was last updated and uploaded on September 2, 2022.
  • Please contact me with any questions, additions, or corrections.

As always, thank you for visiting the website and anything you are wiling or able to share regarding the history of the USS Calvert.